Vesgantti 80" Modular Sectional Sofa, Corduroy Cloud Couch by Vesgantti

Vesgantti 80" Modular Sectional Sofa, Corduroy Cloud Couch

$395.98
Skip to product information
Vesgantti 80" Modular Sectional Sofa, Corduroy Cloud Couch by Vesgantti

Vesgantti 80" Modular Sectional Sofa, Corduroy Cloud Couch

$395.98

Product Overview

Functional and versatile, the Vesgantti 80" Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, 2 Seater Compact Modular Couch, Boneless Sectional Sofa for Small Spaces, No Assembly Required, Grey earns its place in living rooms through everyday usability. measuring 39.8"D x 79.6"W x 32.3"H, weighing 600 Pounds, available in 80" - 2 Seater Grey. Notable features include modular sectional and sectional flexible, contributing to its durable character.

Key Features

  • Modular Sectional, Flexible Layout: This modular sectional sofa is designed for small space living. Use it as a 2 seater sofa, modular couch, or compact sectional. Ideal living room furniture for apartments, bedrooms, studios, and cozy space setups with flexible arrangement options
  • Compact Deep Seat Cloud Comfort: Enjoy cloud couch comfort in a space-saving size. The deep seat sofa design provides ample room for lounging, relaxing, or stretching out. A cozy sectional couch perfect for small families, apartments, or personal relaxation spaces
  • Supportive Spring & Foam Design: Built with durable sinuous springs and high density foam, this sectional couch offers strong support and lasting comfort. A reliable living room sofa that maintains its shape and resists sagging over time
  • Soft & Durable Corduroy Fabric: This corduroy couch features soft, breathable, and skin-friendly fabric. Designed for durability and easy care, making it a great pet friendly sofa for homes with kids and pets while maintaining a modern look
  • Versatile 2-Seater Modular Design: Designed for flexibility, this modular couch can be used as a full 2 seater or separated into individual seating. A multifunctional sectional sofa ideal for lounging, reading, entertaining, or creating a cozy corner setup
  • No Assembly, Easy Setup: Ships in 2 compact boxes for convenient delivery and handling. No tools required—just unpack and allow time to expand. A hassle-free modular sectional sofa for quick and easy home setup

Why Choose the Vesgantti 80" Modular Sectional Sofa

For long-term sofas & couches use, the Vesgantti 80" Modular Sectional Sofa, Corduroy Cloud Couch with Deep Seating & Spring Support, 2 Seater Compact Modular Couch, Boneless Sectional Sofa for Small Spaces, No Assembly Required, Grey offers multi-functional build, modular sectional, and long-term durability — a combination that pays off over time.

Best For

The Vesgantti 80" Modular Sectional Sofa is best suited for: small space living, small families, durability and easy care, flexibility.

Quick Summary

The Vesgantti 80" Modular Sectional Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 21.7 inches. Seat Height: 17.3 Inches. Weight Limit: 600 Pounds. Price: $395.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Seat Depth 21.7 inches
Seat Height 17.3 Inches
Weight Limit 600 Pounds
Seating Capacity 2
Product Dimensions 39.8"D x 79.6"W x 32.3"H
Item Weight 46 Pounds
Type Sectional
Color 80" - 2 Seater Grey

You may also like