Product Overview
Whether for kids rooms or similar needs, the Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa with 2 Ottoman Deep Seat Corduroy Modern Cloud Sofa, Modular Sofas for Living Room, Bedroom and Apartment, Beige | Sink-in Comfort delivers ergonomic quality and modern style. measuring 101"D x 135"W x 35.5"H, weighing 1500 Pounds, available in Corduroy - Beige. Notable features include cloud couch and couch delivers, contributing to its space-saving character.
Key Features
- Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Seven adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
- Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 135"W x 101"D x 35.5"H and seating for 5+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
- Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
- Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
- Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 5 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team
Why Choose the Vesgantti 142" U Shaped Sectional Couch
The Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa with 2 Ottoman Deep Seat Corduroy Modern Cloud Sofa, Modular Sofas for Living Room, Bedroom and Apartment, Beige | Sink-in Comfort earns its place through stylish quality and thoughtful features including cloud couch. The result is space optimization that lasts.
Best For
The Vesgantti 142" U Shaped Sectional Couch is best suited for: stretching out or curling up, all body types.
Quick Summary
The Vesgantti 142" U Shaped Sectional Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Height: 21 Inches. Weight Limit: 1500 Pounds. Seating Capacity: 8.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | No |
| Seat Height | 21 Inches |
| Weight Limit | 1500 Pounds |
| Seating Capacity | 8 |
| Product Dimensions | 101"D x 135"W x 35.5"H |
| Item Weight | 88 Pounds |
| Type | Sectional |
| Color | Corduroy - Beige |
| Style | Modern |