Vesgantti 142" Oversized Sectional Sofa Bed, 8-Seater Modular Sleeper Cloud by Vesgantti

Vesgantti 142" Oversized Sectional Sofa Bed, 8-Seater Modular Sleeper Cloud

$2,599.98
Skip to product information
Vesgantti 142" Oversized Sectional Sofa Bed, 8-Seater Modular Sleeper Cloud by Vesgantti

Vesgantti 142" Oversized Sectional Sofa Bed, 8-Seater Modular Sleeper Cloud

$2,599.98

Product Overview

The Vesgantti 142" Oversized Sectional Sofa Bed, 8-Seater Modular Sleeper Cloud Couch with Movable Ottoman, Chenille Convertible Sofa Set Deep Seat Couches for Living Room, Bedroom and Apartment, Green brings adjustable construction and lasting comfort together, suited for bedrooms. measuring 60"D x 142"W x 35.5"H, weighing 2000 Pounds, available in Chenille - Green. Notable features include cloud couch and couch delivers, contributing to its durable character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 142"W x 60"D x 35.5"H and seating for 4+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 4 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 142" Oversized Sectional Sofa Bed

The Vesgantti 142" Oversized Sectional Sofa Bed, 8-Seater Modular Sleeper Cloud Couch with Movable Ottoman, Chenille Convertible Sofa Set Deep Seat Couches for Living Room, Bedroom and Apartment, Green delivers on three fronts: multi-functional build, cloud couch, and simple assembly. This combination makes it suited for serious sofas & couches use.

Best For

The Vesgantti 142" Oversized Sectional Sofa Bed is best suited for: stretching out or curling up, all body types.

Quick Summary

The Vesgantti 142" Oversized Sectional Sofa Bed is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Height: 21 Inches. Weight Limit: 2000 Pounds. Seating Capacity: 8.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Height 21 Inches
Weight Limit 2000 Pounds
Seating Capacity 8
Product Dimensions 60"D x 142"W x 35.5"H
Item Weight 35 Kilograms
Type Sofa Bed
Color Chenille - Green
Style Modern

You may also like